New Railway Line Set to Transform Northeast Connectivity
Fast Summary
- The ₹8,071 crore, 51.38-km railway line from Bairabi station to Sairang near Mizoram’s capital Aizawl was inaugurated by Prime Minister Narendra Modi.
- The project marks a milestone in Northeast Frontier Railway’s efforts and India’s Capital Connectivity Project aiming to link Northeast states with Kolkata Port via the Myanmar border (Sittwe Port).
- A survey is underway for a proposed 223-km extension from Sairang to Hbichhuah near Myanmar for improving transport between Kolkata and Northeastern regions through sea routes instead of longer road journeys.
- Challenges included terrain, climate delays (construction limited to four months annually), logistical hurdles like building extra roads, landslides risk mitigation during construction, and worker mobilization issues due to poor connectivity.
- Infrastructure includes: 45 tunnels spanning 12.85 km with the longest being 1.87 km; bridges numbering 153 (major & minor), earthquake-resistant structures; renewable ballastless tracks implementation inside tunnels.
- Tragic incidents occurred during construction; one led-to/saw death/multiple deceased cases among labor force especially concerning bridge collapse reports observed backwards “deaths tragic decimals narrowed transportation-linked history tragic notices”.
0 Votes: 0 Upvotes, 0 Downvotes (0 Points)
Stay Informed With the Latest & Most Important News