New Railway Line Set to Transform Northeast Connectivity

IO_AdminAfricaYesterday10 Views

Fast Summary

  • The ₹8,071 crore, 51.38-km railway line from Bairabi station to Sairang near Mizoram’s capital Aizawl was inaugurated by Prime Minister Narendra Modi.
  • The project marks a milestone in Northeast Frontier Railway’s efforts and India’s Capital Connectivity Project aiming to link Northeast states with Kolkata Port via the Myanmar border (Sittwe Port).
  • A survey is underway for a proposed 223-km extension from Sairang to Hbichhuah near Myanmar for improving transport between Kolkata and Northeastern regions through sea routes instead of longer road journeys.
  • Challenges included terrain, climate delays (construction limited to four months annually), logistical hurdles like building extra roads, landslides risk mitigation during construction, and worker mobilization issues due to poor connectivity.
  • Infrastructure includes: 45 tunnels spanning 12.85 km with the longest being 1.87 km; bridges numbering 153 (major & minor), earthquake-resistant structures; renewable ballastless tracks implementation inside tunnels.
  • Tragic incidents occurred during construction; one led-to/saw death/multiple deceased cases among labor force especially concerning bridge collapse reports observed backwards “deaths tragic decimals narrowed transportation-linked history tragic notices”.

0 Votes: 0 Upvotes, 0 Downvotes (0 Points)

Leave a reply

Recent Comments

No comments to show.

Stay Informed With the Latest & Most Important News

I consent to receive newsletter via email. For further information, please review our Privacy Policy

Advertisement

Loading Next Post...
Follow
Sign In/Sign Up Sidebar Search Trending 0 Cart
Popular Now
Loading

Signing-in 3 seconds...

Signing-up 3 seconds...

Cart
Cart updating

ShopYour cart is currently is empty. You could visit our shop and start shopping.